New Projects

Integrated Steel Plants

With extensive expertise in the metals and mining sector coupled with our positioning as a high-quality yet a low-cost producer, we are venturing into steel production with a 1.2 MTPA long products and 3 MTPA flat products offerings in the near future.

The 1.2 MTPA long products ISP will be based in Ghugus and will offer TMT and wire rods. The 3 MTPA flat products ISP will be based in Konsari and will offer Hot rolled coils.

Slurry Pipeline

Lloyds Metals is transforming the way iron ore is transported by constructing two underground iron ore slurry pipelines, each with a capacity of 20 MTPA, spanning 300 kilometers to Konsari and Ghugus. The first 10 MTPA pipeline was commissioned in June 2025, while the second is targeted for completion by Q4 2027.

Additionally, a downhill beneficiation plant will be installed to enhance slurry production and transportation efficiency.
This approach leverages slurry transport to reduce both costs and carbon emissions compared to conventional methods. A dewatering process will also be implemented to produce iron ore filter cake, which will be utilized for pellet production.

New Projects
Llyods Logo Shape

Other Operations

Robot Image
Accessibility Icon
Chatbot icon

Ask Lloyds Metals

Accessibility Adjustments

Content Adjustments

A Minus Decrease Font Size
Default Font Default Font Size
A Plus Increase Font Size
High Titles Highlight Titles
Text Magnify Text Magnifier

Color Adjustments

Light Contrast Light Contrast Theme
Dark Contrast Dark Contrast Theme
High Contrast High Contrast
Monochrome Monochrome
Adjust Text Colors
High Saturation High Saturation
Adjust Title Colors

Orientation Adjustments

Hide Image Hide Images
Highlight Hover Highlight Hover
Big Black Cursor Big Black Cursor
Big White Cursor Big White Cursor